
Renovations and builds in Prague.
No extras at the end.
Bathrooms, flats, turnkey houses and facades. The price and the schedule go in the contract, and the warranty runs for three years. Our own people do the work — no subcontractors.
Free · 60 seconds · no obligation
Services
Interiors, turnkey houses and facades.

Flats and interiors
Floors, plaster, ceilings, partitions, plumbing and electrical work. Flats, houses and commercial spaces.
- Plaster and paint
- Screeds and tiling
- Plasterboard and partitions
- Suspended ceilings
- Bathrooms and wet rooms
- Water and electrical runs

Turnkey houses
We build the house from the first trench to handing over the keys. One company, one contract, a fixed price and a fixed date.
- Site management
- Foundations and structure
- Walls and roof
- All interior trades
- Water, heating and electrics
- Handover and documentation

Facades and historic buildings
Insulation and facade repairs, churches, cultural centres and listed buildings. Where it's needed, we sort things out with the heritage authority.
- Facade restoration and cleaning
- Stone and brick repairs
- Churches and chapels
- Cultural centres and theatres
- Stucco and ornament
- Heritage paperwork and permits
Online estimator
What will it cost? You'll know in 60 seconds.
A few quick questions and you see a rough range straight away. The fixed price — the one that goes in the contract — is confirmed after a free site visit and measurement.
Free · 60 seconds · no obligation
Why RayBer
Fixed price
We agree the price up front and put it in the contract. Nothing gets added at the end.
Our own people
Our own certified workers are on your job, not a chain of subcontractors.
VAT registered
VAT no. CZ17326486. Everything is properly invoiced.
Prague and Central Bohemia
We're based in Vršovice, Prague 10. Further afield by arrangement.
Before and after
The same place. Before and after.




How it works
From enquiry to handover in 4 steps.
Tell us what you need
Fill in the 60-second estimate form, or just call us. We get back to you within 24 hours and it commits you to nothing.
We visit and measure, free
We walk through the flat or house with you, measure it and go over exactly what you want. That's what the itemised budget is built on.
Contract: fixed price and date
The contract holds the price, the schedule and a 3-year warranty. From the moment you sign, you know what it costs — and when it's finished.
The work and the handover
Our own people are on site, not subcontractors. We hand over the finished job and the 3-year warranty keeps running.
Selected projects
Finished buildings, not renderings.

Art Nouveau facade, restored
2025Prague
Full restoration of an Art Nouveau facade: surface repair, reshaped ornamental stucco, new render and paint. Handed over to the heritage authority's requirements.

The same facade before repair
2025Prague
This is how the Art Nouveau facade looked before we started: render coming away, stucco pieces working loose, the surface badly soiled.

Turnkey family bungalow
2025South Moravia
Single-storey house with a hipped tile roof. Foundation slab, masonry, roof frame and roof cover — the whole shell from the first trench to handover.
FAQ
What people ask most often.
Nobody can give you an honest figure without seeing the place — it depends on the scope, the state of the pipework and the materials. Here's how we do it: the online estimator gives you a rough range right away, then we come and measure free of charge and put together an itemised budget with a fixed price. That price goes into the contract and doesn't change at the end.
The fixed price covers the whole agreed scope. If something turns up that wasn't visible at the site visit — usually hidden pipework or wiring — we stop, show it to you and price the fix in writing first. Nothing is done or charged without your say-so.
It depends on the scope, so we won't promise a date from behind a desk. After the measurement you get a work schedule along with the fixed price, and it's part of the contract. We keep to our dates — our own people do the work, so we're never waiting on subcontractors.
Yes. In a panel building we tear out the old umakart core and build a new brick bathroom; in a brick flat we can change the layout too. We've also worked on listed buildings, including the paperwork for the heritage authority.
Three years, written into the contract itself — not into a brochure. And because our own people do the building, you never end up arguing about whose fault it is.
Mainly Prague and Central Bohemia. By arrangement we go further — we've done one build in South Moravia. Call us and we'll tell you straight away whether we can get to you.
Nothing, and it commits you to nothing. The visit and the measurement are free and you get the quote within 24 hours. You only decide once you're looking at an itemised budget with a fixed price. We're VAT-registered, so everything is properly invoiced.
Fixed price. Contract. 3-year warranty.
Sixty seconds and you know roughly what it costs. Then we come and measure for free, and you have the quote within 24 hours.