
Single-family house — turnkey
Central Bohemia
Ytong block walls, full timber roof framing and ceramic tile roof. Delivered in 9 months from foundation to handover.
Selected Projects

Central Bohemia
Ytong block walls, full timber roof framing and ceramic tile roof. Delivered in 9 months from foundation to handover.

South Moravia
Single-storey family house with hipped tiled roof. Walls, roof, façade — full structural delivery.

Central Bohemia
Reinforced concrete slab on insulated block foundation. Pump truck pour with rebar grid.

Central Bohemia
Pre-fabricated timber truss roof structure assembled on site over Ytong block walls.

Praha
Full drywall ceiling system, joint sealing, paint preparation across multiple rooms.

Central Bohemia
Full ground-level sewer and water rough-in routed through foundation prior to slab pour.

South Moravia
Bricklaying of aerated-concrete block walls on prepared foundation strip.

Central Bohemia
Reinforced foundation strips with ceiling formwork prepared for concrete pour.

Central Bohemia
Dimpled membrane on basement walls, perimeter drainage with gravel filter.

Central Bohemia
Façade rehabilitation of a heritage listed complex: careful removal of damaged render, masonry repair, and reinstatement of original surface finish. All works coordinated with the State Heritage Preservation body.

Prague
Full façade renovation including base-layer remediation, new render system and façade paint. Works carried out from full-height scaffolding. Result — clean, even façade with long-term warranty.

Prague
New residential building finished with a silicone-mineral render system in a natural stone tone. Works executed in parallel with the interior finishing phase of the project.

Prague
Documentation and condition survey of a historical façade featuring ornamental stucco decorations. Careful cleaning, stabilisation of detached layers, and crack repair prior to full restoration works.

Prague
Installation of an ETICS external wall insulation system: 140 mm EPS boards, fibreglass mesh, base coat and silicone top-coat render. Full-height aluminium scaffolding throughout the building.

Prague
Complete renovation of an older apartment: demolition works, new partitions, drywall, flooring, painting, plus full electrical and plumbing rough-in. Delivered move-in ready with a modern, bright feel.

Prague
Kitchen zone redesign with a new layout: new laminate flooring, plastering, electrical rough-in, plumbing installation, and fit-out of a full kitchen unit.

Prague
Full bathroom strip-out and rebuild: waterproofing, new 60×120 cm large-format ceramic tile system, wall-hung WC with concealed cistern, and a chrome heated towel rail.

Prague
Multi-unit interior works across a new-build complex: drywall suspended ceilings, plastering, painting, floor screeds, and finishing prep across multiple apartments simultaneously.

Prague
Full-perimeter façade renovation with systematic crack repair, new silicone render in a light tone. Works performed from aluminium scaffolding with protective safety netting.

Prague
Starting condition of an apartment before full renovation: removal of old floor finishes, demolition of partitions, stripping of old plaster. Delivered from shell condition through to complete handover.